The Problem

Leaky, encrusted and rust-pitted pipelines have posed major problems for homeowners, property management companies, trade and industry for years:

Starting with clogged fittings and valves as well as discoloured water, to a drop in performance and pressure due to a reduction in cross-section, to complete corrosion of the pipes.

Depending on the water quality, damage can occur as early as 2-5 years after commissioning the installation.

After 10-15 years, the problem is acute in practically all areas.

In the long term, the only remedy has been to renew the entire pipe network. Impairments caused by dirt, noise and, in some cases, interruptions to the water supply lasting several weeks, combined with high costs, make such renovations unreasonable for all those affected.

Die Lösung

The Solution

InsaTech pipe-in-pipe renovation technology.

Based on transparent communication with our customers and our various important partners, we can cope with any situation at short notice. For long-term, high-quality results. Thanks to many years of experience and research by our engineers, we have developed a revolutionary process that allows a plastic pipe to be produced by spraying the inside walls of the defective pipe. The multiple coating creates a robust and durable pipe. Our pipe-in-pipe coating technology makes it possible to renovate building sewer pipes without having to open up any walls. With this technology we can save the customer not only up to two thirds of the costs, but also the time required. Quality hand-in-hand with experience leads to the solution.

The Solution

InsaTech pipe-in-pipe renovation technology.

Based on transparent communication with our customers and our various important partners, we can cope with any situation at short notice. For long-term, high-quality results. Thanks to many years of experience and research by our engineers, we have developed a revolutionary process that allows a plastic pipe to be produced by spraying the inside walls of the defective pipe. The multiple coating creates a robust and durable pipe. Our pipe-in-pipe coating technology makes it possible to renovate building sewer pipes without having to open up any walls. With this technology we can save the customer not only up to two thirds of the costs, but also the time required. Quality hand-in-hand with experience leads to the solution.

Die Lösung

The Protection

The pipe-in-pipe process offers additional corrosion protection for the pipe after the renovation. For this purpose, the pipe network is lined with an inner coating.

The independent new pipe made of polyurethane resin and corrosion-resistant plastic was specifically developed to meet the needs and requirements of sewer pipes.

It not only prevents the formation of new rust and lime, but also provides a demonstrable improvement in the flow quality.